Prevents gas hydrate formation in high-pressure, low-temperature systems.
Designed to inhibit gas hydrate formation in highly pressurized systems operating at relatively low temperatures. Modifies the properties of the water present and the crystal-formation temperature in gas lines, keeping them in solution even when the thermodynamic conditions for formation are reached.
Onshore and offshore installations in the North, South and Marine Regions: gas intake and compression systems, conduction lines, regulation packages.
Maintains continuity of gas intake and compression, prevents deferred production from plugging, prevents internal pipeline damage and reduces maintenance costs, shutdowns and the risk of removing hydrates.
Laboratory tests as a function of pressure, salinity, water content and system temperature. Optimized by observing line pressure or pig-run results; additional injection points where water condensation is observed.
200-liter plastic drums, 1,000-liter high-density polyethylene containers with metal cage, or stainless steel containers. Store in a cool, ventilated place, protected from direct sun and rain, with containers closed when not in use. Review the product safety data sheet.
| Parameter | Unit | Method | Specification |
|---|---|---|---|
| Appearance | Visual | Colorless liquid | |
| Relative density 20/4 °C | ASTM D1298 | 0.79 – 0.96 | |
| Kinematic viscosity at 40 °C | cSt | ASTM D445 | 1.8 – 4.2 |
| Flash point | °C | ASTM D56 | 23 min. |
Every batch is analysed against the specifications on this sheet before release and ships with its certificate of analysis (CoA) and safety data sheet (SDS).
Dosage, compatibility, laboratory testing and field application: info@tabquimicosintl.com · +1 (956) 708-6776
The information on this sheet is given in good faith and reflects the specifications in force at the revision date. Values are product specifications unless stated as typical. Optimum dosage is determined by laboratory tests on the fluid to be treated. Field performance depends on conditions outside our control; no warranty is given beyond what the contract provides. Review the SDS before handling.